Período de Serviço de Voo

Turco: FDP

ATPL Desempenho humano
IN SHORT

FDP (Flight Duty Period) is the time from when a crew member reports for duty for one or more flights until the end of the last flight, when the aircraft is parked on the stand and the engines are shut down.

What is Flight Duty Period?

Under EASA ORO.FTL rules, the basic maximum daily FDP is 13 hours; it is reduced depending on the reporting time and the number of sectors (minimum 9 hours). Extension, augmented crew and commander's discretion are possible under certain conditions.

As regras de FDP constituem a parte legal do gerenciamento de fadiga; elas são aplicadas em conjunto com os períodos de descanso, limites semanais/mensais e o FRM (Gerenciamento do Risco de Fadiga).

TEST YOURSELF

De acordo com a EASA, qual é o FDP diário máximo básico em horas?

Frequently asked questions about Flight Duty Period

When does the FDP start and end?

The FDP is the time from when a crew member reports for duty until the end of the last flight, when the aircraft is parked on the stand and the engines are shut down.

What reduces the FDP under EASA?

Under EASA ORO.FTL rules, the basic maximum daily FDP is 13 hours; it is reduced depending on the reporting time and the number of sectors, down to a minimum of 9 hours.

How is FDP applied in fatigue management?

FDP rules are the legal part of fatigue management, applied together with rest periods, weekly and monthly limits and FRM (Fatigue Risk Management).

Traduzido por máquina (IA) a partir do nosso Turkish glossary entry usando a terminologia ICAO/EASA. Atualizado em 18 nov 2026 · Relatar um erro: [email protected]