Flight Duty Period

Turkish: FDP

ATPL Human Performance
IN SHORT

FDP (Flight Duty Period) is the time from when a crew member reports for duty for one or more flights until the end of the last flight, when the aircraft is parked on the stand and the engines are shut down.

What is Flight Duty Period?

Under EASA ORO.FTL rules, the basic maximum daily FDP is 13 hours; it is reduced depending on the reporting time and the number of sectors (minimum 9 hours). Extension, augmented crew and commander's discretion are possible under certain conditions.

FDP rules form the legal part of fatigue management; they are applied together with rest periods, weekly/monthly limits and FRM (Fatigue Risk Management).

TEST YOURSELF

According to EASA, what is the basic maximum daily FDP in hours?

Frequently asked questions about Flight Duty Period

When does the FDP start and end?

The FDP is the time from when a crew member reports for duty until the end of the last flight, when the aircraft is parked on the stand and the engines are shut down.

What reduces the FDP under EASA?

Under EASA ORO.FTL rules, the basic maximum daily FDP is 13 hours; it is reduced depending on the reporting time and the number of sectors, down to a minimum of 9 hours.

How is FDP applied in fatigue management?

FDP rules are the legal part of fatigue management, applied together with rest periods, weekly and monthly limits and FRM (Fatigue Risk Management).

Machine-translated (AI) from our Turkish glossary entry using ICAO/EASA terminology. Updated 18 Nov 2026 · Report an error: [email protected]