Период полётного дежурства

Турецкий: FDP

ATPL Human Performance
IN SHORT

FDP (Flight Duty Period) is the time from when a crew member reports for duty for one or more flights until the end of the last flight, when the aircraft is parked on the stand and the engines are shut down.

What is Flight Duty Period?

Under EASA ORO.FTL rules, the basic maximum daily FDP is 13 hours; it is reduced depending on the reporting time and the number of sectors (minimum 9 hours). Extension, augmented crew and commander's discretion are possible under certain conditions.

Правила FDP составляют юридическую часть управления усталостью; они применяются вместе с периодами отдыха, недельными/месячными ограничениями и FRM (Fatigue Risk Management).

TEST YOURSELF

Según EASA, каков базовый максимальный суточный FDP в часах?

Frequently asked questions about Flight Duty Period

When does the FDP start and end?

The FDP is the time from when a crew member reports for duty until the end of the last flight, when the aircraft is parked on the stand and the engines are shut down.

What reduces the FDP under EASA?

Under EASA ORO.FTL rules, the basic maximum daily FDP is 13 hours; it is reduced depending on the reporting time and the number of sectors, down to a minimum of 9 hours.

How is FDP applied in fatigue management?

FDP rules are the legal part of fatigue management, applied together with rest periods, weekly and monthly limits and FRM (Fatigue Risk Management).

Машинный перевод (ИИ) с нашего Turkish glossary entry по терминологии ICAO/EASA. Обновлено 18 2026 · Сообщить об ошибке: [email protected]