ALTN
Alternate Aerodrome
ALTN (alternate aerodrome) is the aerodrome named in the flight plan in advance, to which the aircraft will proceed if landing at the planned aerodrome is not possible; fuel planning also covers the trip to the alternate.
What is ALTN?
Alternate aerodromes are classified by purpose: take-off alternate (if return to the departure aerodrome is not possible), en-route alternate, and destination alternate. For commercial operations, one or two destination alternates may be required depending on the weather forecast and minima at the destination aerodrome.
When selecting an alternate aerodrome, the forecast weather at the estimated time of arrival (TAF), whether the aerodrome is open (NOTAM), runway length and fuel/service availability are checked. In Item 16 of the ICAO flight plan (FPL), the alternate aerodrome is entered using its ICAO code.
Example
How is the aerodrome to be proceeded to if landing at the destination aerodrome is not possible referred to in the flight plan?
A pre-selected alternate aerodrome (alternate aerodrome).
How it is asked in the ATPL exam: 3 questions
Think about your answer, then reveal it.
1. Before taking off for an IFR flight, the commander must ensure that weather information is available showing that conditions at the destination and any alternate aerodrome will be:
- At the estimated time of arrival better than the minimum conditions required for aerodrome use.
- during a period from 1 hour before to 1 hour after the estimated time of arrival at the aerodrome, at or above the planning minima.
- commander shall not take-off for an IFR flight unless information is available indicating that the expected weather conditions at the destination and/or required alternate aerodrome(s) are:
- At the estimated time of arrival, and for a reasonable period before and after such a predicted time, equal to or better than the minimum conditions required for aerodrome use.
Show answer
Correct answer: during a period from 1 hour before to 1 hour after the estimated time of arrival at the aerodrome, at or above the planning minima.
The regulation requires weather to be at or above planning minima during a period from 1 hour before to 1 hour after the estimated arrival time to ensure adequate weather for approach and landing.
2. For a twin-engine aircraft, standard operational take-off minima may be used only if an alternate aerodrome is within:
- 60 minutes at cruising speed all engines running.
- 30 minutes at cruising speed all engines running.
- 30 minutes at cruising speed with one engine unserviceable.
- 60 minutes at cruising speed with one engine unserviceable.
Show answer
Correct answer: 60 minutes at cruising speed with one engine unserviceable.
Twin-engine aircraft must have an alternate within 60 minutes at cruising speed with one engine inoperative to meet standard minima; this ensures a safe diversion option.
3. An operator plans to use a destination alternate aerodrome that has a CAT II approach available. What planning minima must be applied for this alternate?
- RVR according to Cat I.
- Non-precision minima.
- Circling minima.
- Non-precision minima plus 200 ft/1000 m.
Show answer
Correct answer: RVR according to Cat I.
For destination alternates, planning minima are based on CAT I approach minima, even if CAT II or CAT III approaches are available. This ensures a conservative planning standard.
Frequently asked questions about ALTN
What is the difference between an alternate aerodrome and a destination alternate?
An alternate aerodrome is the general name for the aerodrome to proceed to when the planned aerodrome cannot be used; a destination alternate is the type of alternate designated for the destination aerodrome. Take-off alternates and en-route alternates are also types of alternate aerodrome.
When is a destination alternate required?
For commercial operations, one or two destination alternates may be required depending on the weather forecast and minima at the destination aerodrome. When selecting an alternate, the TAF, NOTAMs, runway length and fuel and service availability are checked against the estimated time of arrival.
Machine-translated (AI) from our Turkish glossary entry using ICAO/EASA terminology. Updated 11 Nov 2026 · Report an error: [email protected]