CLIMB

PPLATPLIR Funkverkehr
IN SHORT

CLIMB is an instruction issued by ATC directing the pilot to climb. After receiving the instruction, the pilot may begin climbing to the assigned level.

What is CLIMB?

CLIMB is a directive issued by air traffic control that authorises the pilot to climb to a specified altitude. ATC issues CLIMB instructions for airspace management, traffic flow and safety reasons. The instruction is usually given in the form "Climb to flight level 050" or "Climb to 3000 feet", and once the pilot acknowledges it (ROGER or WILCO), the pilot continues climbing until reaching the assigned level.

In radiotelephony, the CLIMB instruction is one of the basic communication tools between ATC and the pilot. After receiving climb clearance, the pilot may climb from the current level to the assigned level at the most economical climb rate; however, if ATC specifies a different speed or rate of climb, the pilot must comply. When the climb is complete, the pilot informs ATC by reporting "Leveling off flight level 050" or a similar report.

Along with other altitude instructions such as DESCEND, MAINTAIN and LEVEL OFF, the CLIMB instruction forms the basis of ATC operations. Since misunderstanding or delayed execution may lead to traffic conflict, it must be given clearly, unambiguously and promptly on the radio, and repeated back.

Über Funk

ATC Turkish 42, steigen Sie auf Flugfläche 100.
PILOT Turkish 42, steigen auf Flugfläche 100.
ATC Cessna 172 Golf, steigen Sie auf 2500 Fuß.
PILOT Cessna 172 Golf, steigen auf 2500.
ATC Lufthansa 280, steigen auf Flugfläche 250, beschleunigen.
PILOT Lufthansa 280, beschleunigter Steigflug auf Flugfläche 250.
TEST YOURSELF

ATC has instructed you to 'Climb to flight level 080'. Which of the following is the correct procedure?

Frequently asked questions about CLIMB

What should the pilot do when a CLIMB instruction is received?

The pilot acknowledges the instruction with ROGER or WILCO and begins climbing to the assigned level. If ATC specifies a different speed or rate of climb, the pilot must comply.

What does the pilot report to ATC when the climb is complete?

When the climb is complete, the pilot informs ATC by reporting Leveling off flight level 050 or a similar report.

Why must the CLIMB instruction be given clearly?

Because misunderstanding or delayed execution may lead to traffic conflict, the CLIMB instruction must be given clearly, unambiguously and promptly on the radio, and repeated back.

Maschinell übersetzt (KI) aus unserem Turkish glossary entry unter Verwendung der ICAO/EASA-Terminologie. Aktualisiert am 18. Nov 2026 · Fehler melden: [email protected]