EOBT
Estimated Off-Block Time
EOBT (Estimated Off-Block Time) is the estimated time at which an aircraft will leave its parking position (off-block). It comes before take-off and is used in flight planning and ATS coordination.
What is EOBT?
EOBT (Estimated Off-Block Time) is the estimated time at which an aircraft will move from its parking position, that is, from the blocks (off-block). It is not the take-off moment but a time point that comes before take-off. There is taxi time between leaving the block and arriving at the runway threshold, so EOBT and estimated time of departure (ETD) are not the same thing.
ICAO Doc 4444 (PANS-ATM) describes the use of estimated times in flight planning and air traffic services coordination. In Europe, the Eurocontrol Network Manager uses these times in flow management; at aerodromes with slot application, the departure time is planned according to this data. In Türkiye, detailed application is published in the AIP of the relevant state and in the operator's operations manual.
The practical importance for the pilot is that the reported EOBT and the actual situation remain consistent. When a delay arises from passengers, cargo or fuelling, the current EOBT, a flight plan change or re-notification may be required. Delay thresholds and notification procedures vary by state and operator; rather than guessing, the relevant AIP and operator documents should be consulted.
Example
What does EOBT represent?
EOBT (Estimated Off-Block Time) is the estimated time at which the aircraft leaves the blocks. Take-off time comes after this.
Frequently asked questions about EOBT
What is the difference between EOBT and ETD?
EOBT (Estimated Off-Block Time) is the estimated time at which the aircraft leaves its parking position; ETD is the estimated time of take-off. The gap between them covers taxi time, so the two times are not the same.
How is EOBT used in the flight plan?
EOBT is used as the estimated off-block time in flight planning and air traffic services coordination. In Europe, it should not be confused with the TOBT reported by the airline for flow management.
Machine-translated (AI) from our Turkish glossary entry using ICAO/EASA terminology. Updated 14 Nov 2026 · Report an error: [email protected]